Modular music room installations
RNCM (Royal Northern College of Music), Manchester
Created
a "shell building" on brown field site abutting main
campus into which were installed 24 Modular
Rooms of varying size from
individual practice rooms to large ensemble.
Emanuel School, London
Initially
3 individual teaching rooms; later a mezzanine floor was installed onto
which a further 4 rooms were assembled.
Beacon Centre, Hassocks
Conversion
of an old stable block into a music practice and rehearsal facility.
Into two rooms
were installed a Control
Room and Live Room. As live room used for Percussion and Amplified
music in a residential neighbourhood very important that proper sound
insulation was achieved.
Spelthorne College, Ashford, Middx
Desperately
short of space and in need of a Live Room and Control Room with need
to guarantee no noise
break-out. Installation to be finished during Easter closure and fully
ready for use upon return. Brief achieved with a day to spare.
City Learning Centre, Greenhead, Keithley, West
Yorkshire
Need
to turn a storage cupboard into a percussion room on very limited budget.
Room installation completed on time and on budget.
Aberdeen City Music School, Scotland.
A large general music practice room required to go inside an existing
room where noise break-out was occurring
and as this led into the main performance hall there was a need to
ensure sound isolation. Room included a single leaf acoustic
door,
plus a large
pair of 57dB rated steel doors.
City University, London.
Following
a fire the music faculty lost many of their music composition studios. We
had 8 weeks to manufacture and
install 4 modular rooms each with a 57dB rating. These were placed
into a basement area and have proved to be very successful.
St Mary's School, Shaftesbury, Dorset
Plans
to build a new music school and concert hall meant the existing buildings
would be removed.
A temporary structure was created into which were installed 5 modular
rooms. These were demounted and placed into the new structure upon
completion without
any loss of equipment or performance.
Brighton College of Technology
(now City
College Brighton & Hove)
A shortage of Amplified Music teaching space demanded using a spare room
on the 10th floor of Pelham Tower. Sound insulation was a critical component
of the installation - successfully completed.
Queen Margaret's School, Escrick, York
By
using an old stable block that had also been used for storage the music
department were able
to have 5 individual music practice rooms within a grade 2 listed building.
We had to ensure that the interior footprint could not be see from
the outside - brief
achieved. Acoustic door colours matched to school colours!
Mr Andrew Wong, Manchester
Our client,
a well known local DJ and sound mixer wanted his own "in-house" Recording
Studio. We installed a high acoustic performance room into the study
of his duplex penthouse
apartment. The brief was to ensure no sound break-out, but to retain
the views over the city. Brief achieved.